Fire Door Inspection - Various Buildings (see below) - 8 January - 30 March 2025 - 9.00 a.m. - 5.00 p.m.

Posted: 6 January 2025

Description of the Works

The work needs to be done to ensure fire safety compliance within university buildings.

Royce Halls (Blocks 1-5, 9-12, 14-24) (469-490)

Burleigh Court (053)

Link Hotel (202)

Elite Athletes Centre (753)

The RLB Contractors will be working in various locations around the building, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.

Timescale

8 January - 30 March 2025.  Fire door inspections will take place in the buildings above between 9.00 a.m. and 5.00 p.m.

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Rod Harrison - Fire Compliance Contract Supervisor

Mobile:  07729080155

Email:  r.m.harrison@lboro.ac.uk